Refrigerator and method for controlling the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10443913
APP PUB NO 20180100678A1
SERIAL NO

15702663

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refrigerator includes: (i) a compressor; (ii) a condenser; (iii) a decompressor; (iv) an evaporator; (v) a first pipe that connects the compressor, the condenser, the decompressor, and the evaporator, and that circulates a refrigerant therein; (vi) a second pipe that causes the refrigerant to circulate from the condenser to the evaporator; and (vii) a switching valve that switches flow of the refrigerant in the first pipe to the second pipe. A method for controlling the refrigerator includes: conducting a normal cooling operation in which a refrigerant is caused to circulate through a compressor, a condenser, decompressor, and an evaporator; and conducting a defrosting operation in which the refrigerant is caused to circulate through the compressor, the condenser, and the evaporator, excluding the decompressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC CORPORATION1006 OAZA KADOMA KADOMA-SHI OSAKA 571-8501

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horii, Katsunori Shiga, JP 43 92
Horio, Yoshimasa Shiga, JP 4 21
Sakai, Hisakazu Shiga, JP 6 66
Segawa, Terutsugu Osaka, JP 25 199
Takami, Fuminori Osaka, JP 12 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00