Hydroelectric power generation device for operation with water flow of sanitary piping

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10443561
SERIAL NO

15980696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydroelectric power generation device is structure to utilize water flowing to generate electrical power that could be supplied to a bathroom installation and is generally made up of a functional main body, a battery assembly, and a power generation module. The functional main body has two opposite sides each including a mounting end formed thereon. The functional main body forms therein a receiving chamber. The power generation module includes a stator and a rotor. The rotor is coupled, in a manner of being rotatable, to an axle, which is coupled to a vane wheel. Water flowing into the device drives the vane wheel and the rotor to rotate simultaneously so that magnetic interaction between the rotor and the stator generates electrical power that is supplied to a sensor controlling supply of water flow. A sleeve is fit over the axle for correcting and stably supporting the axle in rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANG SHUN MINGNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yang, Shun-Ming New Taipei, TW 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00