Implant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10441456
APP PUB NO 20100163056A1
SERIAL NO

12632005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an implant for a palate, in particular a human palate. The implant comprises a proximal portion, a distal portion and a middle portion. The proximal portion is dimensioned in such a way that it can be fixed to a hard palate. The distal portion is arranged at an angle in relation to the proximal portion and is dimensioned in such a way that it can be accommodated completely in a soft palate. The middle portion extends between the proximal portion and the distal portion. In a sectional plane extending through the proximal portion and the distal portion, the curvature of the middle portion at each of its points is greater than the curvature of the proximal portion at each of its points and greater than the curvature of the distal portion at each of its points.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDARTIS AGHOCHBERGERSTRASSE 60E BASEL 4057

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Breitenstein, Michael Wenslingen, CH 7 69
Tschopp, Kurt Liestal, CH 2 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00