Composition for forming resist underlayer film with reduced outgassing

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10437150
APP PUB NO 20110230058A1
SERIAL NO

13131474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Underlayer films of high-energy radiation resists applied onto semiconductor substrates in a lithography process for producing semiconductor devices and that are used to prevent reflection, static electrification, and development defects and to suppress outgassing during the exposure of resist layers with high-energy radiation are prepared from compositions including a film component having an aromatic ring structure or a hetero ring structure. The film component having an aromatic ring structure or a hetero ring structure is contained at a proportion of 5 to 85% by mass. The film component may be a compound having an aromatic ring structure or a hetero ring structure, and the compound may be a polymer or a polymer precursor including a specific repeating unit. The aromatic ring may be a benzene ring or fused benzene ring, and the hetero ring structure may be triazinetrione ring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN CHEMICAL INDUSTRIES LTDCHIYODA-KU TOKYO 101-0054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Endo, Takafumi Toyama, JP 85 967
Ho, Bangching Toyama, JP 12 531
Sakamoto, Rikimaru Toyama, JP 115 978

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00