Gas burner arrangement, cooktop and stove

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10436452
APP PUB NO 20170138606A1
SERIAL NO

15319811

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas burner arrangement for a hotplate includes at least two gas burners, each gas burner having operably connected thereto a gas valve for regulating a combustion gas flow to the gas burners, and a thermoelement for monitoring a flame of the gas burners. The thermoelement is coupled to the gas valve by an electrical circuit, such that when the flame of the associated gas burner is extinguished, the combustion gas flow to the gas burner is interrupted with the aid of the gas valve. Each electrical circuit includes a mechanically actuatable switch configured to couple or decouple the electrical circuit between the associated thermoelement and the associated gas valve. The mechanically actuatable switch includes a contact element having a noble metal. A shared actuation element controls the mechanically actuatable switches of the electric circuits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BSH HAUSGERAETE GMBHCARL-WERY-STR 34 MUENCHEN D-81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Martinez, Diez Alvaro Peñacastillo, ES 3 3
Palacios, Valdueza Luis Antonio Astillero, ES 16 17
Pelayo, Alonso Carlos Villafufre, ES 4 3
Placer, Maruri Emilio Liencres, ES 21 64
Saiz, Gonzalez Roberto Villapresente-Cantabria, ES 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00