Construction methods and systems for grade separation structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10435853
APP PUB NO 20190048540A1
SERIAL NO

16077103

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cut and cover method of constructing grade separation structures includes partially burying precast substructure elements with associated trench boxes under live traffic. Once the precast substructure elements are buried, the substructure is completed and the bridge span is installed. Other methods include installing precast superstructure elements with a formwork system and forming a bridge substructure and excavating underneath the superstructure once the superstructure is formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRADE SEPARATION SYSTEMS INC171 WALGREEN ROAD CARP ONTARIO K0A 1L0

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carson, Eric William Ottawa, CA 2 0
Ivantchouk, Artem Ottawa, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00