Method for manufacturing slide fastener chain

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10433620
APP PUB NO 20170332744A1
SERIAL NO

15535934

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A waterproof fastener chain includes: a pair of fastener tapes made of polyester resin adjacent to each other at a given space between each side edge thereof, rows of elements respectively attached onto a main surface of the side edge of each of the fastener tapes, and waterproof coated films made of polyester resin respectively formed on a main surface of each of the fastener tapes. An outer surface of each of the waterproof coated films is flat at least at a position where a slider is to pass over, each of the waterproof coated films penetrates into irregularities on the main surface of each of the fastener tapes, a penetration depth of the waterproof coated films into a gap caused by the space of the pair of fastener tapes is not more than thickness of the fastener tapes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YKK CORPORATION1 KANDA IZUMI-CHO CHIYODA-KU TOKYO 1018642 ?1018642

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Yui Toyama, JP 7 53
Kameyama, Hirokazu Toyama, JP 52 975
Michihata, Isamu Toyama, JP 32 465

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00