Combustion apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10422527
APP PUB NO 20180216816A1
SERIAL NO

15749253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion apparatus having: an upstream-side air supply chamber and a downstream-side mixing passage, both being respectively interposed between a fan and a burner; and a zero governor which is interposed in a gas supply passage and which adjusts a secondary gas pressure to a pressure equivalent to an internal pressure in the air supply chamber, thereby enabling to maximize a turndown ratio to the extent possible. The combustion apparatus has: first and second, totally two, mixing passages; a first gas outlet which is in communication with a narrowed part of the first mixing passage; a second gas outlet which is in communication with a narrowed part of the second mixing passage; a first air valve which varies an opening degree of an air inlet of the first mixing passage; a second air valve which varies an opening degree of an air inlet of the second mixing passage; and a gas valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RINNAI CORPORATION2-26 FUKUZUMI-CHO NAKAGAWA-KU NAGOYA-SHI 454-0802

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akagi, Kazuyuki Aichi, JP 16 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00