Combustion module having improved operational safety and optimized thermal efficiency

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10422522
APP PUB NO 20160209080A1
SERIAL NO

15000904

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion module including a body including a combustion chamber, and at least one connector for supplying the combustion chamber with at least one combustible intended to be burned in the combustion chamber, is provided. The supply connector includes at least one inlet orifice intended to be connected to at least one source of combustible through a conduit and at least one outlet orifice intended to be connected to the at least one combustion chamber. The supply connector has a thermal conductivity substantially lower than that of the body such that the supply connector assures that the temperature at the inlet orifice of the supply connector and the conduit is lower than the auto-ignition temperature of the combustible(s).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES25 RUE LEBLANC 75015 PARIS 75015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mantzaras, Ioannis Zurich, CH 2 0
Ollier, Emmanuel Grenoble, FR 19 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00