Coaptation plate comprising a metal core and a polymer overmould

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10420594
APP PUB NO 20170325861A1
SERIAL NO

15536575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application relates to a coaptation plate comprising a core and an overmold, the core comprising at least one window which is designed to at least partially extend over a fracture which separates a first portion of the osseous tissue from a second, the window being positioned between two openings through which a fastening screw passes, wherein one of said openings lies at least partially within a proximal portion of the core and the other opening lies at least partially within a distal portion of the core, the overmold enclosing the core and forming at least one upper layer and one lower layer on either side of the core, the window defining polymer material links that pass through the core and connect the upper layer and the lower layer, thus ensuring that the overmold is anchored in the core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORNIER38330 MONTBONNOT-SAINT-MARTIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Houvet, Patrick Boulogne-Billancourt, FR 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00