Well testing with jet pump

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10408043
APP PUB NO 20180112516A1
SERIAL NO

15298708

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus can include a jet pump with a nozzle and a throat, a flow passage for conducting production fluid to the throat, and a check valve that prevents flow from the throat to the flow passage and permits flow from the flow passage to the throat. A method can include performing a bottomhole well pressure test while measuring well pressure with a well parameter sensor connected to a jet pump, and then retrieving the well parameter sensor and the jet pump together from the well. A system can include a jet pump sealingly received in a tubular string, the jet pump including a throat that receives a power fluid from a nozzle and receives a production fluid from a flow passage, and a check valve permitting flow of the production fluid from the flow passage to the throat and preventing flow of the power fluid to the flow passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WELLS FARGO BANK NATIONAL ASSOCIATION1525 WEST W T HARRIS BLVD CHARLOTTE NC 28262

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knoeller, Michael C Humble, US 6 125
Mathews, Jason W Houston, US 14 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00