Power generation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10407933
APP PUB NO 20180195303A1
SERIAL NO

15912590

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a pool cleaning robot that may include (i) a turbine that is at least partially disposed within a fluid path of the robot to extract energy from flow of fluid through the fluid path; (ii) an electrical generator for providing electrical power thereto and adapted to be driven by the turbine; (iii) a rechargeable power source arranged to be charged by the electrical generator, and (iv) a controller that is arranged to direct the pool cleaning robot to be positioned in a certain location in which a flow level of fluid that is circulated by a pool fluid circulation system is higher than a flow level of the fluid within a majority of the pool, wherein when positioned at the certain location the fluid that is circulated by the pool fluid circulation system passes through the fluid path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAYTRONICS LTDKIBBUTZ YIZRAEL 1935000 KIBBUTZ YIZRAEL 1935000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tamar, Yaniv Gan Ner, IL 7 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00