Method of constructing a geological model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10401534
APP PUB NO 20160139299A1
SERIAL NO

14944419

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of constructing a geological model of a subterranean formation formed of at least two sedimentary beds is described. Based on measurements of the geometry of boundaries of beds of the subterranean formation carried out on a grid, values of geometry of each bed at any point of the grid are calculated according to at least the steps of defining a succession of coarser and coarser grids, constructed based on the grid of interest; proceeding from the coarsest grid to the grid of interest, determining the geometry of the boundaries of each bed by solving an inverse problem initialized with the result obtained for the previous coarser grid. Next, constructing the geological model based on the completed geometry of each boundary of beds on the grid of interest.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLESFRANCE RUEZ - MA MAISON RUEIL-MALMAISON HAUTS-DE-SEINE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leger, Michel Rueil-Malmaison, FR 19 375

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00