Vertical bearing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10400821
APP PUB NO 20180238389A1
SERIAL NO

15753325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an annular portion of a thrust collar rotates together with a rotating shaft member, centrifugal force and shear force, or differential pressure caused by difference in flow rate are generated in lubricating oil in a circulation oil chamber. With this, the lubricating oil in the circulation oil chamber is guided from the inner peripheral side to the outer peripheral side of the annular portion, through a circulation hole penetrating the annular portion. The flow of lubricating oil guided by the circulation hole forms a flow of lubricating oil from a lower oil chamber to an upper oil chamber through the circulation oil chamber. As a result, the lubricating oil stored in the lower oil chamber is circulated to the upper oil chamber through the circulation oil chamber, by rotation of the thrust collar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIDO METAL COMPANY LTD13F NAGOYA HIROKOJI BLDG 3-1 SAKAE 2-CHOME NAKA-KU NAGOYA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mori, Shigeyoshi Inuyama, JP 10 30
Na, Kwangik Inuyama, JP 4 7
Nagasaki, Tadatoshi Inuyama, JP 4 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00