Method for production of additives enhancing water tightness of building materials

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10399896
APP PUB NO 20170166479A1
SERIAL NO

15325566

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an apparatus and a method for production of additives enhancing water tightness of structural and binding building materials. The method comprises the steps of: preparing a hydrophobing agent by esterifying 60-80 m % of vegetable oil by a mixture consisting of 20-40 m % ethyl alcohol and 0.1-5 m % of methyl alcohol of the whole mass of the agent, then adding 5-30 m % agent by spraying through nozzles and water to a body of burnt lime in a reactor, and prior to adding the agent and water a mixture of 2-8 m % ethyl alcohol and 0.1-1 m % of methyl alcohol of the whole mass of the body of burnt lime is added by spraying through nozzles, while the mixture is agitating mechanically till a homogeneous mixture is prepared, then adding 40-65 m % water to the mixture, and ceasing mechanical agitating after commencement of the fierce chemical reaction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TÖRÖCSIK FERENC5000 SZOLNOK

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Torocsik, Dora Oroshaza, HU 1 0
Torocsik, Ferenc Oroshaza, HU 3 46
Torocsik, Tunde Oroshaza, HU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00