Process for treating a sulfurous fluid to form gypsum and magnesium carbonate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10399862
APP PUB NO 20180002187A1
SERIAL NO

15543594

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for treating a sulfurous fluid to form gypsum and magnesium carbonate, whereby the sulfurous fluid is scrubbed with a sequestrating agent to yield a scrubbed fluid, gypsum and magnesium sulfate. The flue gas desulfurized gypsum is isolated from the magnesium sulfate solution by filtration or centrifugation. The magnesium sulfate is reacted with a carbonate salt to produce a magnesium carbonate whereby the reaction conditions are controlled to control the properties of the magnesium carbonate produced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMERYS PIGMENTS INC100 MANSELL COURT EAST SUITE 300 ROSWELL GA 30076

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Butler-Lee, Gavin St. Austell, GB 5 15
Golbayani, Parvin Kennesaw, US 11 15
Jarvis, Nigel Victor St. Austell, GB 5 15
Paynter, Christopher Atlanta, US 20 42
Perez, Ricardo M Cumming, US 6 16
Pring, Graham M Lostwithiel, GB 9 44
Stovall, Kalena Atlanta, US 9 15
Taylor, David Marietta, US 162 7732
Wicks, Douglas Johns Creek, US 25 179

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00