System and methods for kinetic rotation of a ride vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10398991
APP PUB NO 20180339234A1
SERIAL NO

15606846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ride system in accordance with present embodiments includes a flume providing a flow path and one or more vehicles configured to accommodate one or more passengers and configured to move along the flow path in the flume. The ride system also includes one or more objects protruding into the flow path, wherein the one or more objects are positioned in the flow path such that the one or more objects are configured to contact a vehicle of the one or more vehicles as the vehicle moves along the flow path and at a contact location on an exterior of the vehicle, wherein the contact location is spaced apart a distance from a center of mass of the vehicle to change a direction or orientation of the vehicle after the one or more objects contact the vehicle at the contact location.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSAL CITY STUDIOS LLC100 UNIVERSAL CITY PLAZA UNIVERSAL CITY CA 91608

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Habersetzer, Michael Davies Orlando, US 1 5
Vance, Eric Alan Orlando, US 9 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00