Film forming method, film forming system and surface processing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10392698
APP PUB NO 20180037989A1
SERIAL NO

15667817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal-containing film can be formed with high continuity with respect to a base when forming the metal-containing film on the base by CVD or ALD. A film forming method of forming, by ALD or CVD, a Ti-containing film on a base film of a processing target object having a SiO2 film as the base film includes performing a surface processing of accelerating formation of a silanol group on a surface of the SiO2 film by bringing a fluid containing O and H into contact with the surface of the SiO2 film; and performing a film forming processing of forming the Ti-containing film on the SiO2 film, on which the surface processing is performed, by the ALD or the CVD with a Ti source gas which reacts with the silanol group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO ELECTRON LIMITEDTOKYO 107-6325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaneko, Miyako Nirasaki, JP 23 190
Noro, Naotaka Nirasaki, JP 20 50
Takahashi, Tsuyoshi Nirasaki, JP 198 3130
Yamazaki, Kazuyoshi Nirasaki, JP 75 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00