Vessel and boom construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10392083
APP PUB NO 20180141621A1
SERIAL NO

15568598

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vessel including a boom construction, especially a gangway construction, for transferring persons and/or cargo from said vessel to an offshore object or vice versa. The boom construction includes an elongated mast structure extending in a direction substantially upwards from a deck of said vessel. Said mast structure is pivotally mounted with respect to a hull of the vessel in a manner such as to be pivotable with respect to said hull about a single pivot axis only. The boom construction further includes a boom, especially a gangway, which is connected to the mast structure and which extends from the mast structure in a substantially sideward direction. Furthermore, the boom construction includes at least one actuator for pivoting the mast structure such as to compensate for at least a part of a roll movement of the hull of the vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFEWAY B V3313 LA DORDRECHT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Van, Aalst Gerbrand August Wijnand Dordrecht, NL 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00