Refrigeration cycle device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10391839
APP PUB NO 20180222289A1
SERIAL NO

15749130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refrigeration cycle device includes a pre-evaporator decompression unit that decompresses refrigerant which flowed out from an exterior heat exchanger, and an evaporator passage that guides the refrigerant which flowed out from the exterior heat exchanger to a suction port of a compressor while passing through a pre-evaporator decompression unit and an evaporator. Further, the refrigeration cycle device includes a bypass passage that guides the refrigerant which flowed out from the exterior heat exchanger to the suction port of the compressor while bypassing the pre-evaporator decompression unit and the evaporator, a pre-exterior device switching unit, and a passage switching unit that opens and closes the bypass passage. Further, the pre-exterior device switching unit and the passage switching unit form a coupled valve where the pre-exterior device switching unit and the passage switching unit are mechanically coupled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itoh, Satoshi Kariya, JP 91 1465
Itou, Tetsuya Kariya, JP 17 395
Kawakubo, Masaaki Kariya, JP 36 360

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00