Packet data network, a method for operating a packet data network and a flow-based programmable network device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10389623
APP PUB NO 20160020998A1
SERIAL NO

14772790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A packet data network includes a flow-based programmable network device. The flow-based programmable network device includes a data plane having a plurality of input and output ports, a control interface and forwarding rules that map packets received on one of the input ports to one of the output ports based on a packet matching a rule in the forwarding rules. A controller entity is configured to program the flow-based programmable network device via the control interface. The flow-based programmable network device has a connection via the data plane to at least one delegated entity which is a network device configured to process network traffic on behalf of the flow-based programmable network device in a transparent manner from a perspective of the controller entity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC CORPORATION7-1 SHIBA 5-CHOME MINATO-KU TOKYO 108-8001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bifulco, Roberto Heidelberg, DE 36 186
Dietz, Thomas Weingarten, DE 41 454
Konstantaras, Stavros Amsterdam, NL 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00