Combined cycle power plant and start-up method of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10385736
APP PUB NO 20170022847A1
SERIAL NO

15214502

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a combined cycle power plant in which a high-pressure steam turbine and an intermediate-pressure steam turbine can operate in a state where amounts of thermal effect thereof are close to a limit value, and capable of reducing start-up time. A combined cycle power plant includes: an exhaust heat recovery boiler that includes a high-pressure superheater which superheats steam for a high-pressure steam turbine, and a reheater which reheats steam for an intermediate-pressure steam turbine; bypass pipes through which steam bypasses the high-pressure superheater and the reheater; bypass valves that regulate flow rates of steam which flows through the bypass pipes; and a bypass controller that controls the bypass valves such that a difference between thermal effect-amount margins of the turbines is decreased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iyanaga, Norihiro Yokohama, JP 10 73
Kawata, Miyuki Tokyo, JP 6 14
Kim, Eunkyeong Tokyo, JP 9 58
Suzuki, Fumiyuki Yokohama, JP 48 353
Yamanaka, Kazunori Yokohama, JP 91 798
Yashiki, Tatsuro Tokyo, JP 14 80
Yoshida, Takuya Tokyo, JP 81 471
Yoshida, Yasuhiro Tokyo, JP 180 2165

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00