Method of planning scaffolding for construction of an industrial plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10385575
APP PUB NO 20160292310A1
SERIAL NO

15070460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to a method for the construction of an industrial plant, in particular a petroleum refinery, by means of scaffolding units, each of which will be assembled from individual scaffolding components, comprising the following steps:

    Providing a 3D-construction plan in which building structures of the industrial plant are recorded;Drawing of scaffolding units to be used for the construction of the industrial plant in the 3D construction plan of the industrial plant including modifying of the 3D construction plan with respect to at least one building structure of the industrial plant for use of a predetermined scaffolding unit;Building of the industrial plant according to the modified construction plan and by use of the scaffolding units drawn in the 3D construction plan. The method according to the invention, allows for a significant reduction of scaffolding costs incurred during the construction of any industrial plant. The cost saving effects of the method according to the invention can be further increased by modifying the construction plan, wherever possible, for the use of the predetermined scaffolding units which may be of different or equal design.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERI GMBH89264 WEISSENHORN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grassa, Giovanni Ontario, CA 2 0
Lawrence, Dave Airdrie, CA 9 153
Skelton, Rod Crossfield, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00