Refiner beating method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10385507
APP PUB NO 20160362835A1
SERIAL NO

15174237

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refiner includes a main body, a rotation shaft provided inside the main body, a tapered rotor attached to the rotation shaft with a space therein, a stator provided in the main body, a rotor beating portion provided on the rotor and having a groove between bars and through-holes, a stator beating portion on the stator with a groove between bars and through-holes, a raw material supply portion for supplying a raw material into the main body, and a raw material discharge portion for discharging a beaten raw material outside the main body. A portion of the raw material guided to a small-diameter opening portion of the rotor and the space of the rotor is beaten by passing through the through-holes of the rotor beating portion and the stator beating portion, and is discharged outside the stator beating portion from the through-holes of the stator beating portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIKAWA IRON WORKS CO LTD24-2 TENMA-CHO AOI-KU SHIZUOKA 420-0858

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aikawa, Masaki Shizuoka, JP 22 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00