Process for preparing a polymerized cashew nut shell liquid and its use for the preparation of a bitumen composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10385235
APP PUB NO 20170152384A1
SERIAL NO

15362200

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for the preparation of a polymerized CNSL composition, the method comprising subjecting a raw or technical CNSL to a heat treatment under reflux to obtain the polymerized CNSL composition, wherein the heat treatment is performed until the polymerized CNSL composition has a molecular weight Mw of about 2800 to about 3700, such as from about 2900 to about 3600, or from about 3000 to about 3500 g/mol. The invention further relates to a polymerized CNSL composition, use of a polymerized CNSL composition according to the invention in a bitumen composition, a modified bitumen composition according to the invention and an asphalt composition comprising a modified bitumen composition according to the present invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VENTRACO INNOVATION CENTRE AMSTERDAM B V1031 HM AMSTERDAM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eijkenboom, Antonius Caspar Johannes Heerhugowaard, NL 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00