Melt-guiding connection adapter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10384390
APP PUB NO 20180326643A1
SERIAL NO

15774204

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a connection adapter for connecting two melt-guiding components having two adapter halves having connection means for connection to a respective one of the components and having connection means for connecting the two adapter halves to one another and having a melt-guiding piece that is adapted to a first of the melt-guiding components by a first opening cross-section and to the second of the melt-guiding components by a second opening cross-section. The invention furthermore relates to a melt processing plant having two melt-guiding components such as an extruder and a pelletizer that are connected to one another by such a connection adapter. In accordance with the invention, the melt-guiding piece is formed separately from the adapter halves and is tensionable against the melt-guiding components by the mutually connected adapter halves.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAAG GALA INC181 PAULEY STREET EAGLE ROCK VA 24085

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berrendorf, Matthias Xanten, DE 2 0
Veltel, Juergen Kevelaer, DE 8 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00