Splitting facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10378128
APP PUB NO 20170321352A1
SERIAL NO

15524801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A facility for manufacturing at least first and second assemblies of M1 filamentary elements and M2 filamentary elements, in which each of the first and second assemblies includes a plurality of filamentary elements wound together in a helix, includes an assembling apparatus and a splitting apparatus. The assembling apparatus of the facility assembles M filamentary elements together into a layer of M filamentary elements around a temporary core, to form a temporary assembly. The splitting apparatus of the facility splits the temporary assembly into at least the first and second assemblies of M1 filamentary elements and M2 filamentary elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICHELIN RECHERCHE ET TECHNIQUE S AROUTE LOUIS BRAILLE 10 GRANGES-PACCOT CH-1763
COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN23 PLACE DES CARMES-DECHAUX 63000 CLERMONT-FERRAND 63000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aubarede, Francis Clermont-Ferrand, FR 12 57
Barguet, Henri Clermont-Ferrand, FR 30 293
Calvet, Marc Clermont-Ferrand, FR 6 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00