High-speed rail train bogie and frame thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10377393
APP PUB NO 20170232979A1
SERIAL NO

15502688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-speed rail train bogie frame includes side sills and cross beams located between the side sills, and each of the side sills is provided with an air spring seat configured to install an air spring; wherein each of the cross beams has a seamless steel tube structure; the frame further includes a passage, and a main air chamber of the air spring and a cavity of the cross beam are in communication with each other through the passage; and an anti-roll bar seat configured to install an anti-roll bar is welded below the side sill, and the anti-roll bar seat is in a circular arc transition with a bottom of the side sill, to form a dovetail structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRRC QINGDAO SIFANG CO LTDCHENGYANG DISTRICT OF SHANDONG CITY OF QINGDAO PROVINCE JINHONG ROAD 266111 NO 88 QINGDAO CITY SHANDONG PROVINCE 266111

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Xiaoyan Shandong, CN 51 166
Song, Xiaowen Shandong, CN 3 4
Wang, Xiaoming Shandong, CN 171 867
Zhang, Zhenxian Shandong, CN 7 17
Zhou, Pingyu Shandong, CN 7 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00