Control systems and methods to optimize machine placement for additive construction operations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10377125
APP PUB NO 20180162065A1
SERIAL NO

15373600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for a machine, operating on a worksite is associated with an implement, which perform additive construction operations in accordance with a pre-determined implement control plan. The system includes a positioning system, one or more implement control actuators, and a controller. The positioning system is configured to determine positioning signals associated with, at least, a terrain of the worksite and any worksite objects existing thereon. The controller determine an available zone, in which the machine and implement are capable of executing the additive construction operations within the available zone, based on the positioning signals and the pre-determined implement control plan, and determine an operation zone, relative to a desired additive construction site on the worksite, within the available zone, wherein parameters of the operation zone are based, at least in part, on the available zone, the machine configuration, and the pre-determined implement control plan.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR INC100 NE ADAMS STREET PEORIA IL 61629-9510

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Qi Dunlap, US 279 1873
Clar, Jean-Jacques Edelstein, US 24 707
Friend, Paul Mortion, US 21 327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00