Method for the production of a polycarbonate laminate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10377116
APP PUB NO 20160129679A1
SERIAL NO

14959356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to the use of a preparation comprising A) 0.1 to 20 wt % of a binding agent with a polycarbonate derivative based on a geminally disubstituted dihydroxydiphenyl cycloalkane, B) 30 to 99.9 wt % of an organic solvent or of a mixture of solvents, C) 0 to 10 wt %, referred to dry mass, of a dye or of a mixture of dyes, D) 0 to 10 wt % of a functional material or of a mixture of functional materials, E) 0 to 30 wt % of additive and/or auxiliary substances, or of a mixture of such substances, the relative amounts of the components A) to E) always totaling 100 wt %, as an ink jet printing dye.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BUNDESDRUCKEREI GMBH10969 BERLIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ehreke, Jens Berlin, DE 12 87
Mathea, Arthur Berlin, DE 23 127
Meyer, Klaus Dormagen, DE 112 899
Muth, Oliver Berlin, DE 29 233
Paeschke, Manfred Basdorf, DE 73 1086
Pflughoefft, Malte Berlin, DE 16 100
Pudleiner, Heinz Krefeld, DE 106 717
Yesildag, Cengiz Leverkusen, DE 7 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00