Shield indent trench termination for shielded gate MOSFETs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10374076
APP PUB NO 20190006512A1
SERIAL NO

15639961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a general aspect, a power semiconductor device can include a semiconductor region having an active region and a termination region. The device can also include a plurality of trench shield electrodes each having a first portion disposed in the active region and a second portion disposed in the termination region. One or more of the trench shield electrodes can have a second portion that extends a first distance into the termination region, while one or more other trench shield electrodes can have a second portion that extends a second distance into the termination region, the second distance being less than the first distance. The trench shield electrode(s) having the second portion that extends the second distance into the termination region can be interleaved with the trench shield electrode(s) having the second portion that extends the first distance into the termination region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR COMPONENTS INDUSTRIES LLC5701 N PIMA ROAD SCOTTSDALE AS 85250

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Xiaoli Shanghai, CN 14 6
Yedinak, Joseph Mountain Top, US 6 249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00