Sensor, input device, and input/output device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10372272
APP PUB NO 20150346867A1
SERIAL NO

14725457

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel input sensor that is highly convenient or reliable is provided. A novel input device that is highly convenient or reliable is provided. A novel input/output device that is highly convenient or reliable is provided. The sensor, the input device, and the input/output device include a sensor element and a sensor circuit which includes first to third transistors. A gate of the first transistor is electrically connected to one of a source and a drain of the third transistor and to a first electrode of the sensor element. One of a source and a drain of the first transistor is electrically connected to a second electrode of the sensor element and to a first wiring through which a control signal capable of controlling a potential of the second electrode of the sensor element is configured to be supplied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDJAPAN'S KANAGAWA PREFECTURE ATSUGI CITY ATSUGI-SHI KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyake, Hiroyuki Kanagawa, JP 618 12888

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00