Ignition apparatus for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10371117
APP PUB NO 20170117078A1
SERIAL NO

15301789

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition apparatus includes a blow-off determining unit. The blow-off determining unit determines, when a secondary electric current drops below a predetermined threshold value Ia during a determination period, that blow-off has occurred; the determination period is a predetermined time period ΔT from the start of a spark discharge by a main ignition circuit. Further, when it is determined that blow-off has occurred during a main ignition (full-transistor ignition), it is controlled to perform a continuing spark discharge after the main ignition in a next cycle. Moreover, a secondary electric current command value I2a in performing the continuing spark discharge is set to an electric current value that is obtained by adding a predetermined electric current value α to the predetermined threshold value Ia used in the blow-off determination. Consequently, in the next cycle, it is possible to reliably prevent blow-off, thereby reliably preventing a misfire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kyouda, Kenta Kariya, JP 3 11
Nakayama, Satoru Kariya, JP 25 138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00