Numerical-control machine tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10363644
APP PUB NO 20180281137A1
SERIAL NO

15938010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A numerical-control machine tool is provided and includes a load-bearing beam which extends horizontally, has two axial ends resting in sliding manner on two lateral shoulders that rise from a basement and extend horizontally side by side so as to define a longitudinal corridor orthogonal to the longitudinal axis of the beam; a spindle-holding carriage which is movable on the load-bearing beam parallel to the longitudinal axis of the beam; a spindle-holding shaft which is fixed to the spindle-holding carriage in a vertical position, and is movable on the spindle-holding carriage parallel to its longitudinal axis; a front wall and a rear wall that close the two ends of the longitudinal corridor; an upper cover which closes the longitudinal corridor at the top; and an ambient conditioning unit which is adapted to bring and maintain the temperature of the air present inside the machining chamber around a given target value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PARPAS S P AITALY KADUONEIGAI CANELLI ASTI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Parpajola, Vladi Cadoneghe, IT 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00