Methods for making lead-carbon couplings, lead-carbon electrode sheets and lead-carbon batteries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10361420
APP PUB NO 20170263912A1
SERIAL NO

15256933

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for making lead-carbon coupling, lead-carbon electrode sheets, and a lead-carbon battery are revealed. The coupling methods consist of steps of assembling the carbon material that contains oxygen functional groups or metal precursors and lead material in contact with each other and then heating the assembled lead-carbon pair to form lead oxides or metal carbides as a bridge to form coupled lead-carbon interface with high electrochemical and mechanical stability. This coupled lead-carbon structure is applied to form lead-carbon electrode sheets and is further used as electrode sheets of lead-carbon batteries by lead welding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTE OF NUCLEAR ENERGY RESEARCH ATOMIC ENERGY COUNCIL EXECUTIVE YUAN R O CNO 1000 WENHUA RD JIAAN VILLAGE LONGTAN DISTRICT TAOYUAN CITY 32546

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiang, Anthony Shiaw-Tseh Taoyuan, TW 9 12
Chiang, Sheng-Hsiang Taoyuan, TW 4 5
Hsieh, Shu-Huei Yunlin County, TW 9 37
Jan, Ya-Wun Yunlin County, TW 2 1
Liao, Wen-Chen Taoyuan, TW 3 6
Shen, Ann-Tinn Taoyuan, TW 1 1
Su, Yi-Cheng Yunlin County, TW 11 63
Tzeng, Yi-Ren Taoyuan, TW 8 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00