Method for producing a multi-layer component and multi-layer component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10361018
APP PUB NO 20150123516A1
SERIAL NO

14407919

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a multilayer component (21) is specified, which involves providing a body having dielectric layers (3) arranged one above another and first and second electrically conductive layers (4, 84, 5, 85) arranged therebetween. The first conductive layers (4, 84) are connected to a first auxiliary electrode (6) and the second conductive layers (5, 85) are connected to a second auxiliary electrode (7). The body (1, 81) is introduced into a medium and a voltage is applied between the first and second auxiliary electrodes (6, 7) for producing a material removal. Furthermore, a multilayer component is specified, which has depressions (20) formed by an electrochemically controlled material removal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK ELECTRONICS AGROSENHEIMER STR 141E MUENCHEN 81671

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auer, Christoph Graz, AT 29 88
Fuchs, Gerhard Steinerkirchen, AT 146 4939
Rinner, Franz Deutschlandsberg, AT 46 463
Somitsch, Dieter Gross St. Florian, AT 10 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00