Method and apparatus for moving a ship over land

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10358179
APP PUB NO 20180105218A1
SERIAL NO

15565150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ship or other large and heavy load may be supported on a fluid cushion comprising a two dimensional array of airbags constrained within elastic mesh compartments (81) and inflated by individual valve assemblies (188, 189, 231 . . . ) which are connected by a grid of airlines and distributed over a flexible web (60) separating respective horizontal layers of the assembly. The ship rests on an upper layer while the compartments of a lower layer are inflated and deflated in sequence to generate a travelling contraction which moves through the fluid cushion to translate its base surface over the ground in any desired direction of travel, with the load gradually moving by fluid pressure in the same direction. The deflated cushion assembly can be stored and deployed on a spool (see FIG. 1-3) rotated by a hydraulic motor. Independent claims are included to the cushion assembly including an elastic or other tension force generating means, the compartmentalized structure, the layered structure, the deployment spool, the distributed valve assemblies, and corresponding methods of operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FINCH STEVEN CAFFALLLONDON E7 8QW

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Finch, Steven Caffall London, GB 6 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00