Linearized model based powertrain MPC

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10358140
APP PUB NO 20190100217A1
SERIAL NO

15719963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion system, control system, and method are provided for optimizing fuel economy, which use model predictive control systems to generate a plurality of sets of possible command values and determine a cost for each set of possible command values based on weighting values, a plurality of predicted values, and a plurality of requested values. The set of possible command values having the lowest cost is determined. A linearized axle torque requested value and a linearized axle torque measured value are each created by subtracting an estimated disturbance. The estimated disturbance is determined based on a model of a relationship between measured engine output torque and measured transmission ratio. The linearized axle torque measured value is used to compute the predicted values, which are used to determine the cost. The linearized axle torque requested value is also used to determine the cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 DETROIT MI 48265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bemporad, Alberto Lucca, IT 17 410
Bernardini, Daniele Milan, IT 17 410
Livshiz, Michael Ann Arbor, US 57 1600
Pattipati, Bharath South Lyon, US 13 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00