Paper-made staple and paper-made staple assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10357988
APP PUB NO 20160318331A1
SERIAL NO

15208147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A paper-made staple binds a sheet bundle subjected to folding processing by a folding blade and a folding roller. The paper-made staple includes a pair of leg portions inserted into the sheet bundle and then bent inward; and a connection portion that connects the leg portions in a staple longitudinal direction. The connection portion has, at an edge portion thereof, a cut in a direction crossing the longitudinal direction so as to correspond to a predetermined folding position of the sheet bundle for the purpose of facilitating the folding of the connection portion, and the cut is formed inward from the edge portion so as to have a substantially triangular shape and is provided on both edge portions of the connection portion of the paper-made staple.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON FINETECH NISCA INC14-1 CHUO 1-CHOME MISATO-SHI SAITAMA 341-8527

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukasawa, Eiji Yamanashi-ken, JP 35 244
Kobayashi, Takuma Yamanashi-ken, JP 59 1142
Kondo, Isao Yamanashi-ken, JP 48 366
Nakajima, Junya Yamanashi-ken, JP 42 243
Ono, Seiji Yamanashi-ken, JP 38 76
Saito, Takashi Yamanashi-ken, JP 545 6818
Yoshimura, Kenichi Yamanashi-ken, JP 93 784

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00