Control circuit for power converter with isolated or non-isolated feedback

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10355603
APP PUB NO 20180054131A1
SERIAL NO

15673646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one general aspect, a control circuit for a power converter can include a feedback terminal configured to be coupled to a non-isolated feedback of the power converter when a feedback of the power converter is the non-isolated feedback, or configured to be coupled to a ground when the feedback of the power converter is an isolated feedback. The control circuit can include a detection circuit, coupled to the feedback terminal. The detection circuit can be configured to trigger a feedback voltage at the feedback terminal within an initial setting of the power converter. The feedback voltage can be high in response to the feedback terminal being coupled to the feedback of the power converter, and the feedback voltage can be low in response to the feedback terminal being coupled to the ground of the power converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR COMPONENTS INDUSTRIES LLC5701 N PIMA ROAD SCOTTSDALE AS 85250

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiu, Chen-Hua New Taipei, TW 15 112
Lin, Mao-Sheng New Taipei, TW 8 31
Zhang, Guangchao San Jose, US 10 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00