Isotope production system having a target assembly with a graphene target sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10354771
APP PUB NO 20180130567A1
SERIAL NO

15348198

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Target assembly for an isotope production system. The target assembly includes a target body having a production chamber and a beam cavity that is adjacent to the production chamber. The production chamber is configured to hold a target material. The beam cavity opens to an exterior of the target body and is configured to receive a particle beam that is incident on the production chamber. The target assembly also includes a target sheet positioned to separate the beam cavity and the production chamber. The target sheet has a side that is exposed to the production chamber such that the target sheet is in contact with the target material during isotope production. The target sheet includes graphene.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 NEUMANN WAY EVENDALE OH 45215

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eriksson, Tomas Uppsala, SE 41 289
Norling, Jonas Uppsala, SE 10 108
Pärnaste, Martin Uppsala, SE 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00