Method and apparatus for periodic ion collisions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10354761
APP PUB NO 20170309351A1
SERIAL NO

15481061

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are disclosed herein relating to fusion reactors for fusing particles via multiple periodic collisions. A fusion reactor may include a first evacuated region, such as a chamber, with a plurality of charged particles therein. A uniform magnetic field may be applied to the region to radially confine moving charged particles within the region by inducing circular trajectories. Upper and lower electrodes may be positioned on ends of the region to axially confine charged particles within the region. An energizing beam may be pulsed at a cyclotron frequency corresponding to the mass and charge of the particles to cause oscillating periodic collisions of the particles along the beam path as the particles travel in the circular trajectories with increased velocity after each pulse of the energizing beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FENLEY JOHNPROVO UT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fenley, John Provo, US 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00