Process for producing aldehydes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10351503
APP PUB NO 20180305285A1
SERIAL NO

15768397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates generally to processes for producing aldehydes wherein an olefinic compound, carbon monoxide, and hydrogen are reacted in the presence of a solubilized rhodium-phosphorous complex. In one embodiment, the process comprises (a) receiving a vaporized aldehyde product stream downstream from a hydroformylation reactor, the vaporized aldehyde product stream comprising aldehydes, phosphorous ligand, and aldehyde condensation by-products; (b) contacting the vaporized aldehyde product stream with a partial condenser so as to condense the phosphorous ligand and the by-products, wherein up to 10 weight percent of the vaporized stream is condensed; (c) removing the condensed phosphorous ligand and the condensed by-products from the liquid condensation stream using a refining column; and (d) further processing the vaporized aldehydes from the separate refining column.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNION CARBIDE CORPORATION7501 STATE HIGHWAY 185 NORTH SEADRIFT TX 77983

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Simpson, Kathleen Gandeeville, US 3 7
Smith, Gerald L Dickinson, US 30 431

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00