Methods and systems for using a tapped transformer to generate voltage sags

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10345831
APP PUB NO 20180095485A1
SERIAL NO

15282265

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device includes a three phase supply input including a first phase input, a second phase input, and a third phase input. The device further includes a three phase supply output including a first phase output, a second phase output, and a third phase output. The device further includes a three-phase wye-connected auto-transformer having windings including a first winding, a second winding, and a third winding. At least one of the windings is rated for at least a maximum line to line voltage of the three phase supply input. The other two windings are rated for at least a maximum line to neutral voltage of the three phase supply input. One or more of the windings of the three-phase wye-connected auto-transformer are configured to be tapped to generate a voltage sag output as the three phase supply output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL AUTOMATION TECHNOLOGIES INC1 ALLEN-BRADLEY DRIVE MAYFIELD HEIGHTS OH 44124

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schneider, Robert S Middleton, US 7 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00