Microwave and millimeter wave package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10340224
APP PUB NO 20170141047A1
SERIAL NO

15212525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A package includes a conductor base plate having a element fixed to an upper surface thereof, a side wall provided on the conductor base plate to surround the element, the side wall having a conductor portion electrically connected to the conductor base plate, a dielectric cap disposed on the side wall, a front-side metal film provided on an outer surface of the dielectric cap, a first back-side metal film provided on an inner surface of the dielectric cap such that a center of the first back-side metal film approximately coincides with a center of a surface of the dielectric cap which faces the conductor base plate, and a plurality of vias passing through the dielectric cap to achieve electrical connection between the front-side metal film and the first back-side metal film and between the front-side metal film and the conductor portion oldie side wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maehara, Hiroaki Tokyo, JP 18 186
Miyashita, Miyo Tokyo, JP 33 369
Yamamoto, Kazuya Tokyo, JP 164 2356

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00