Rotor bow comprising a tubular guide element, particularly for a machine for processing elongate strand material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10329712
APP PUB NO 20170218566A1
SERIAL NO

15502560

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Flyer bow for a wire-braiding or cable-twisting machine, comprising a bow member that has a groove extending essentially along the entire longitudinal extension of the flyer bow in the longitudinal direction of the flyer bow. The flyer bow comprises a tubular guiding element, especially a coil spring, for guiding the elongate strand-type material that is placed in the groove without interruption, essentially along the entire longitudinal extension of the groove. The inner dimensions of the groove at any point along the longitudinal extension of the guiding element are greater than or equal to the outer dimensions of the guiding element at the same point. This makes it easy to remove and introduce, preferably pull out and insert, the guiding element from and into the groove.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASCHINENFABRIK NIEHOFF GMBH & CO KGWALTER-NIEHOFF-STR 2 SCHWABACH 91126

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lammermann, Helmut Schwabach, DE 8 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00