Connection substation for wave energy converters in a wave power station

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10328996
APP PUB NO 20180312224A1
SERIAL NO

15770939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection substation for a plurality of wave energy converters being part of a wave power station includes a transformer and a connecting device for electrically connecting input power cables to a common output cable. The connection substation has a buoyant body portion providing a buoyancy force and a fastening device for securing at least one mooring line connected to an anchor, wherein the at least one fastening device is disposed in the vicinity of the bottom end of the connection substation at a distance from an upper end of the buoyant body portion, wherein the at least one connecting device is disposed in a waterproof compartment in the connection substation, and wherein each of the plurality of input power cables are run so that at least a portion of the cable extends up to a level at least 2 meters above the design waterline of the connection substation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
W4P WAVES4POWER AB426 58 VÄSTRA FRÖLUNDA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alm, Filip Bohus, SE 17 64
Claesson, Lennart Angered, SE 3 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00