Impellers for engine mounted boost stage pumps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10323648
APP PUB NO 20180291919A1
SERIAL NO

15482278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A boost pump includes a boost cover and a main pump housing engaged opposite to the boost cover with an impeller rotatably engaged between the boost cover and main pump housing. The impeller includes an inducer section comprising a hub including a plurality of axial blades extended therefrom, each of the plurality of blades including a root, a tip, first and second surfaces, wherein the each of the first and second surfaces is defined in TABLE 1. The impeller includes an impeller section comprising a shroud extending from the hub including a plurality of radial blades extended therefrom. Each of the plurality of blades can include including a root, a tip, and opposed pressure and suction sides extending from the root to the tip, wherein the each of the pressure and suction sides is a surface defined in at least one of TABLES 2-4.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATION4747 HARRISON AVENUE PO BOX 7002 ROCKFORD IL 61125-7002

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harder, Benjamin T DeKalb, US 18 48
Stoicescu, Adrian L Roscoe, US 25 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00