System, method, apparatus, means, and computer program product for recycling asphalt shingles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10323149
APP PUB NO 20180201787A1
SERIAL NO

15922384

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an asphalt mix suitable for use as an asphalt pavement is provided. The method may include receiving in a preliminary mixing unit an asphalt shingle material input from a first feed system and a fluid asphalt material input from a second feed system, and heating and melting the asphalt shingle material and the fluid asphalt material in the preliminary mixing unit and then agitating the same to produce a molten asphalt. The method may include receiving in a primary mixing unit recycled asphalt material input from a third feed system and particulate material input from a fourth feed system, and mixing the molten asphalt from the preliminary mixing unit in the primary mixing unit with the same to produce an output of said asphalt mix. The method may include recirculating, in an intermediate tank, the molten asphalt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE CAINE GROUP LLC114 TIMBERLAKE COURT MOUNT GILEAD NC 27306

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Russell, Atlas James Albermarle, US 3 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00