CIP wash comparison and simulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10315235
APP PUB NO 20160045943A1
SERIAL NO

14818015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment includes a method for simulating an operational effect of one or more changes in a CIP process. The method includes providing a graphical user interface configured to receive inputs from a user, receiving at least one proposed adjustment to one CIP phase of the CIP process, and generating a simulated CIP process based on a first set of CIP data and the at least one proposed adjustment to generate simulated CIP data based on the simulated CIP process. The simulated CIP data is displayed on the display. The simulated CIP data includes at least one of the amount or the total cost of each consumable used to generate the simulated CIP data. A total cost of the simulated CIP process is calculated, where the total cost of the simulated CIP process incorporates the proposed adjustment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOLAB USA INC1 ECOLAB PLACE SAINT PAUL MN 55102

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curran, Joseph P Mahtomedi, US 5 57
Jensen, Finn Arden, DK 32 879
Kingsbury, Jonathan Apple Valley, US 6 15
Krohn, James Oakdale, US 3 15
Schacht, Paul Oakdale, US 7 70
Young, Juli Farmington, US 3 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00